Viau Food Products
Laval
Stabilization works
Important stabilization work has been carried out in the
Viau food products.
The presence of a void under the slab caused it to move and it was dangerous when forklifts were circulating there. The injections were made in protected areas and therefore 100% of the dust created by the drilling was eliminated at the source. GeoFix to solve their problem quickly. Under no circumstances were the operations of the factory stopped.
The project in short
Concrete straightening, production: Viau Food Products

Collaboration with a concrete finishing company.

A solution 90% less expensive than the alternative (demolition-reconstruction)