The Church of Contrecoeur

Reluctant

Straightening of 130 linear feet of concrete

130 linear feet of concrete were straightened by an average of 3” because water was accumulating on the sidewalk.

This meant that in winter, ice accumulated in passing places. The intervention was also able to allow people to circulate in complete safety since the sidewalk was very grippy. The wheelchair ramp was also collapsed. After our visit, all these problems were solved without breaking anything!

The project in short

Concrete straightening, realization: the Contrecoeur church

Renewed heritage.

A solution 90% less expensive than the alternative (demolition-reconstruction)