Saint-Joseph School

Montreal

Concrete slab straightening

During spring break, two GeoFix teams were called in to fix a problem in the establishment.

In fact, three classrooms in the school sank an average of two inches. Students and teachers had to adjust their desks accordingly to the extreme slope in the floor. In one day, our teams managed to straighten the concrete slab and put it back in its original place.

The project in short

Concrete straightening, realization: St-Joseph school

Correction of competitor’s work.

A solution 90% less expensive than the alternative (demolition-reconstruction)